Outdoor Lighting, Electrical Work, and Internet Connections
August 20–23, 2024 · Milestone 26 of 39

We continued improving the church grounds and facilities with new outdoor lighting, electrical outlets, and internet connections.
A trench was dug from the fellowship hall to a tree, and cable was laid inside a protective pipe. Outlets and a floodlight were installed on the tree, while additional cable was routed through the hall ceiling.