An unexpected puff back, when the heating system’s burner misfires and blows soot through the building, spread soot through our church, leaving walls, stairs, and other surfaces in need of extensive cleaning. What followed was a demanding season of restoration, carried forward through God’s help and the care of everyone who supported the work.
January 31 — Discovering the Damage
Soot covered the walls, stairways and the boiler room, and we saw the extent of the cleanup ahead.
February 2 — Checking the Sanctuary
We carefully examined the sanctuary to assess the effects of the soot and determine the work needed to care for our place of worship.
February 20–26 — Scaffolding and Cleaning
Scaffolding was erected so that workers could reach the high ceilings and upper walls. The patient work of cleaning began to reveal the beauty of the church once again.
February 26–28 — Removing Damaged Ceilings
Ceilings in the halls and kitchen were taken down as the restoration extended into the spaces that support our fellowship and service.
February 28–March 12 — Restoring the Finishing Touches
The work continued with repairs, painting, and finishing details, including the freshly repainted sanctuary ceiling. Its clean white surface became a hopeful image of renewal after weeks of difficult work.
Together, these weeks tell one story, from the first signs of soot to a church lovingly restored. We thank God for sustaining us and for every person whose efforts helped bring this work to completion.